Westbury Unit Development Corrutank Stormwater Detention System

Tefco Piping Systems successfully designed and delivered a custom Corrutank stormwater detention system for a new unit development in Westbury, Tasmania. Engineered to efficiently manage stormwater runoff, this system was tailored to meet specific site requirements while ensuring long-term reliability.

 

Westbury Unit Development 1 1 scaled

 

Westbury Unit Development 6

Project Details:
  • Pipes Used: 2 x 30m DN750 Corrutech Pipes
  • Total Volume Capacity: Over 30,000 litres
  • Cover: 75mm to the underside of the concrete
  • Installation Time: Completed in just 3 hours
  • Jointing System: 100% rubber ring jointed, including inlet and outlet connections
Key Highlights:
  • Efficient Installation: Installed in just 3 hours, minimizing site disruption and reducing on-site labour costs.
  • High-Capacity Solution: With a total capacity exceeding 30,000 litres, the detention system effectively manages runoff while ensuring compliance with local regulations.
  • Optimized for Site Constraints: The low cover requirement (75mm to the underside of the concrete) reduced excavation depths, making it ideal for sites with ground restrictions.
  • Durable & Reliable: The 100% rubber ring jointed system ensures watertight seals, minimizing maintenance needs and enhancing long-term performance.

Westbury Unit Development 3

Westbury Unit Development 5

The Corrutank system provided a cost-effective, durable, and efficient stormwater management solution, seamlessly integrating with the site’s requirements. Its rapid installation, reduced excavation needs, and long-lasting reliability made it the ideal choice for the client.